Sum-of-Processing-Times-Based Two-Agent Single-Machine Scheduling with Aging Effects and Tardiness

Joint Authors

Kim, Do Gyun
Choi, Jin Young

Source

Mathematical Problems in Engineering

Issue

Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-12, 12 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2015-07-27

Country of Publication

Egypt

No. of Pages

12

Main Subjects

Civil Engineering

Abstract EN

We consider a two-agent single-machine scheduling problem that minimizes the total weighted tardiness of one agent under the restriction that the second agent is prohibited from having tardy jobs.

The actual processing times of all jobs are affected by a sum-of-processing-times-based aging effect.

After showing the NP-hardness of the problem, we design a branch-and-bound (B&B) algorithm to find an optimal solution by developing dominance properties and a lower bound for the total weighted tardiness to increase search efficiency.

Because B&B takes a long time to find an optimal solution, we propose a genetic algorithm as an efficient, near optimal solution approach.

Four methods for generating initial populations are considered, and edge recombination crossover is adopted as a genetic operator.

Through numerical experiments, we verify the outstanding performance of the proposed genetic algorithm.

American Psychological Association (APA)

Kim, Do Gyun& Choi, Jin Young. 2015. Sum-of-Processing-Times-Based Two-Agent Single-Machine Scheduling with Aging Effects and Tardiness. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-12.
https://search.emarefa.net/detail/BIM-1074678

Modern Language Association (MLA)

Kim, Do Gyun& Choi, Jin Young. Sum-of-Processing-Times-Based Two-Agent Single-Machine Scheduling with Aging Effects and Tardiness. Mathematical Problems in Engineering No. 2015 (2015), pp.1-12.
https://search.emarefa.net/detail/BIM-1074678

American Medical Association (AMA)

Kim, Do Gyun& Choi, Jin Young. Sum-of-Processing-Times-Based Two-Agent Single-Machine Scheduling with Aging Effects and Tardiness. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-12.
https://search.emarefa.net/detail/BIM-1074678

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1074678