![](/images/graphics-bg.png)
Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources
المؤلفون المشاركون
Fernandez-Viagas, Victor
Framinan, Jose M.
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-19، 19ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2015-03-15
دولة النشر
مصر
عدد الصفحات
19
التخصصات الرئيسية
الملخص EN
The amount of resources assigned to a task highly influences its processing time.
Traditionally, different functions have been used in the literature in order to map the processing time of the task with the amount of resources assigned to the task.
Obviously, this relation depends on several factors such as the type of resource and/or decision problem under study.
Although in the literature there are hundreds of papers using these relations in their models or methods, most of them do not justify the motivation for choosing a specific relation over another one.
In some cases, even wrong justifications are given and, hence, infeasible or nonappropriated relations have been applied for the different problems, as we will show in this paper.
Thus, our paper intends to fill this gap establishing the conditions where each relation can be applied by analysing the relations between the processing time of a task and the amount of resources assigned to that task commonly employed in the production and project management literature.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Fernandez-Viagas, Victor& Framinan, Jose M.. 2015. Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-19.
https://search.emarefa.net/detail/BIM-1074827
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Fernandez-Viagas, Victor& Framinan, Jose M.. Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources. Mathematical Problems in Engineering No. 2015 (2015), pp.1-19.
https://search.emarefa.net/detail/BIM-1074827
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Fernandez-Viagas, Victor& Framinan, Jose M.. Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-19.
https://search.emarefa.net/detail/BIM-1074827
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1074827
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)