Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources

Joint Authors

Fernandez-Viagas, Victor
Framinan, Jose M.

Source

Mathematical Problems in Engineering

Issue

Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-19, 19 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2015-03-15

Country of Publication

Egypt

No. of Pages

19

Main Subjects

Civil Engineering

Abstract EN

The amount of resources assigned to a task highly influences its processing time.

Traditionally, different functions have been used in the literature in order to map the processing time of the task with the amount of resources assigned to the task.

Obviously, this relation depends on several factors such as the type of resource and/or decision problem under study.

Although in the literature there are hundreds of papers using these relations in their models or methods, most of them do not justify the motivation for choosing a specific relation over another one.

In some cases, even wrong justifications are given and, hence, infeasible or nonappropriated relations have been applied for the different problems, as we will show in this paper.

Thus, our paper intends to fill this gap establishing the conditions where each relation can be applied by analysing the relations between the processing time of a task and the amount of resources assigned to that task commonly employed in the production and project management literature.

American Psychological Association (APA)

Fernandez-Viagas, Victor& Framinan, Jose M.. 2015. Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-19.
https://search.emarefa.net/detail/BIM-1074827

Modern Language Association (MLA)

Fernandez-Viagas, Victor& Framinan, Jose M.. Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources. Mathematical Problems in Engineering No. 2015 (2015), pp.1-19.
https://search.emarefa.net/detail/BIM-1074827

American Medical Association (AMA)

Fernandez-Viagas, Victor& Framinan, Jose M.. Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-19.
https://search.emarefa.net/detail/BIM-1074827

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1074827