An Integrated Multiechelon Logistics Model with Uncertain Delivery Lead Time and Quality Unreliability
المؤلفون المشاركون
Yang, Ming-Feng
Lin, Yi
Ho, Li Hsing
Kao, Wei Feng
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2016، العدد 2016 (31 ديسمبر/كانون الأول 2016)، ص ص. 1-13، 13ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2016-04-24
دولة النشر
مصر
عدد الصفحات
13
التخصصات الرئيسية
الملخص EN
Nowadays, in order to achieve advantages in supply chain management, how to keep inventory in adequate level and how to enhance customer service level are two critical practices for decision makers.
Generally, uncertain lead time and defective products have much to do with inventory and service level.
Therefore, this study mainly aims at developing a multiechelon integrated just-in-time inventory model with uncertain lead time and imperfect quality to enhance the benefits of the logistics model.
In addition, the Ant Colony Algorithm (ACA) is established to determine the optimal solutions.
Moreover, based on our proposed model and analysis, the ACA is more efficient than Particle Swarm Optimization (PSO) and Lingo in SMEIJI model.
An example is provided in this study to illustrate how production run and defective rate have an effect on system costs.
Finally, the results of our research could provide some managerial insights which support decision makers in real-world operations.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Yang, Ming-Feng& Lin, Yi& Ho, Li Hsing& Kao, Wei Feng. 2016. An Integrated Multiechelon Logistics Model with Uncertain Delivery Lead Time and Quality Unreliability. Mathematical Problems in Engineering،Vol. 2016, no. 2016, pp.1-13.
https://search.emarefa.net/detail/BIM-1112725
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Yang, Ming-Feng…[et al.]. An Integrated Multiechelon Logistics Model with Uncertain Delivery Lead Time and Quality Unreliability. Mathematical Problems in Engineering No. 2016 (2016), pp.1-13.
https://search.emarefa.net/detail/BIM-1112725
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Yang, Ming-Feng& Lin, Yi& Ho, Li Hsing& Kao, Wei Feng. An Integrated Multiechelon Logistics Model with Uncertain Delivery Lead Time and Quality Unreliability. Mathematical Problems in Engineering. 2016. Vol. 2016, no. 2016, pp.1-13.
https://search.emarefa.net/detail/BIM-1112725
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1112725
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر