An Integrated Multiechelon Logistics Model with Uncertain Delivery Lead Time and Quality Unreliability

Joint Authors

Yang, Ming-Feng
Lin, Yi
Ho, Li Hsing
Kao, Wei Feng

Source

Mathematical Problems in Engineering

Issue

Vol. 2016, Issue 2016 (31 Dec. 2016), pp.1-13, 13 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2016-04-24

Country of Publication

Egypt

No. of Pages

13

Main Subjects

Civil Engineering

Abstract EN

Nowadays, in order to achieve advantages in supply chain management, how to keep inventory in adequate level and how to enhance customer service level are two critical practices for decision makers.

Generally, uncertain lead time and defective products have much to do with inventory and service level.

Therefore, this study mainly aims at developing a multiechelon integrated just-in-time inventory model with uncertain lead time and imperfect quality to enhance the benefits of the logistics model.

In addition, the Ant Colony Algorithm (ACA) is established to determine the optimal solutions.

Moreover, based on our proposed model and analysis, the ACA is more efficient than Particle Swarm Optimization (PSO) and Lingo in SMEIJI model.

An example is provided in this study to illustrate how production run and defective rate have an effect on system costs.

Finally, the results of our research could provide some managerial insights which support decision makers in real-world operations.

American Psychological Association (APA)

Yang, Ming-Feng& Lin, Yi& Ho, Li Hsing& Kao, Wei Feng. 2016. An Integrated Multiechelon Logistics Model with Uncertain Delivery Lead Time and Quality Unreliability. Mathematical Problems in Engineering،Vol. 2016, no. 2016, pp.1-13.
https://search.emarefa.net/detail/BIM-1112725

Modern Language Association (MLA)

Yang, Ming-Feng…[et al.]. An Integrated Multiechelon Logistics Model with Uncertain Delivery Lead Time and Quality Unreliability. Mathematical Problems in Engineering No. 2016 (2016), pp.1-13.
https://search.emarefa.net/detail/BIM-1112725

American Medical Association (AMA)

Yang, Ming-Feng& Lin, Yi& Ho, Li Hsing& Kao, Wei Feng. An Integrated Multiechelon Logistics Model with Uncertain Delivery Lead Time and Quality Unreliability. Mathematical Problems in Engineering. 2016. Vol. 2016, no. 2016, pp.1-13.
https://search.emarefa.net/detail/BIM-1112725

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1112725