A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study

المؤلفون المشاركون

Tan, Baohui
Ren, Fengyu
Ning, Youjun
He, Rongxing
Zhu, Qiang

المصدر

Advances in Civil Engineering

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-17، 17ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-10-17

دولة النشر

مصر

عدد الصفحات

17

التخصصات الرئيسية

هندسة مدنية

الملخص EN

A new mining scheme by employing the induced caving mining method to exploit hanging-wall ore-body during the transition from open pit to underground mining is proposed.

The basic idea is to use the mined-out area generated by the planned mining of the hanging-wall ore-body to absorb the collapsed slope body, so as to avoid the influence of the inner-slope mining to the normal open-pit mining and guarantee mining efficiency during the transition stage.

Numerical simulation study on the process of induced caving mining of hanging-wall ore-body is carried out based on the practical engineering setting of the Hainan iron mine, China, by employing the numerical method of discontinuous deformation analysis (DDA).

The impact of rock mass structure on the mechanism of slope instability development and the mining hazard assessment in the new mining scheme is investigated.

The influence of mining sequence on slope instability development and mining safety is also analyzed by taking the hanging-wall ore-body mining under the southern anti-dip slope at the Hainan iron mine as an example, and eventually a reliable mining scheme via induced caving is obtained.

The numerical study proves the feasibility of the proposed new mining scheme for hanging-wall ore-body and provides theoretical and technical support for its application in practical mining activities.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Tan, Baohui& Ren, Fengyu& Ning, Youjun& He, Rongxing& Zhu, Qiang. 2018. A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study. Advances in Civil Engineering،Vol. 2018, no. 2018, pp.1-17.
https://search.emarefa.net/detail/BIM-1115381

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Tan, Baohui…[et al.]. A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study. Advances in Civil Engineering No. 2018 (2018), pp.1-17.
https://search.emarefa.net/detail/BIM-1115381

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Tan, Baohui& Ren, Fengyu& Ning, Youjun& He, Rongxing& Zhu, Qiang. A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study. Advances in Civil Engineering. 2018. Vol. 2018, no. 2018, pp.1-17.
https://search.emarefa.net/detail/BIM-1115381

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1115381