A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study

Joint Authors

Tan, Baohui
Ren, Fengyu
Ning, Youjun
He, Rongxing
Zhu, Qiang

Source

Advances in Civil Engineering

Issue

Vol. 2018, Issue 2018 (31 Dec. 2018), pp.1-17, 17 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2018-10-17

Country of Publication

Egypt

No. of Pages

17

Main Subjects

Civil Engineering

Abstract EN

A new mining scheme by employing the induced caving mining method to exploit hanging-wall ore-body during the transition from open pit to underground mining is proposed.

The basic idea is to use the mined-out area generated by the planned mining of the hanging-wall ore-body to absorb the collapsed slope body, so as to avoid the influence of the inner-slope mining to the normal open-pit mining and guarantee mining efficiency during the transition stage.

Numerical simulation study on the process of induced caving mining of hanging-wall ore-body is carried out based on the practical engineering setting of the Hainan iron mine, China, by employing the numerical method of discontinuous deformation analysis (DDA).

The impact of rock mass structure on the mechanism of slope instability development and the mining hazard assessment in the new mining scheme is investigated.

The influence of mining sequence on slope instability development and mining safety is also analyzed by taking the hanging-wall ore-body mining under the southern anti-dip slope at the Hainan iron mine as an example, and eventually a reliable mining scheme via induced caving is obtained.

The numerical study proves the feasibility of the proposed new mining scheme for hanging-wall ore-body and provides theoretical and technical support for its application in practical mining activities.

American Psychological Association (APA)

Tan, Baohui& Ren, Fengyu& Ning, Youjun& He, Rongxing& Zhu, Qiang. 2018. A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study. Advances in Civil Engineering،Vol. 2018, no. 2018, pp.1-17.
https://search.emarefa.net/detail/BIM-1115381

Modern Language Association (MLA)

Tan, Baohui…[et al.]. A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study. Advances in Civil Engineering No. 2018 (2018), pp.1-17.
https://search.emarefa.net/detail/BIM-1115381

American Medical Association (AMA)

Tan, Baohui& Ren, Fengyu& Ning, Youjun& He, Rongxing& Zhu, Qiang. A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study. Advances in Civil Engineering. 2018. Vol. 2018, no. 2018, pp.1-17.
https://search.emarefa.net/detail/BIM-1115381

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1115381