الملخص EN

Early cost estimates are emphasized repeatedly in the initial decision-making process to set a direction for the success of construction projects.

Therefore, alternatives need to be examined, and the consequences for the cost should be analyzed carefully.

This study proposes a scenario-planning method that uses morphological analysis for the estimation of construction cost.

A case study was conducted using public data on 102 apartment buildings from 10 housing complex projects.

The results show estimation accuracy of 4.23 to 4.86% and an average stability enhancement of 1.39 to 1.73%.

The proposed process can produce adaptable scenarios and evaluate the impact of the scenarios in a complicated decision-making process with limited information provided.

Furthermore, this method can provide a contingency plan to cushion against uncertainties.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Ji, Sae-Hyun& Ahn, Joseph. 2019. Scenario-Planning Method for Cost Estimation Using Morphological Analysis. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1116364

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Ji, Sae-Hyun& Ahn, Joseph. Scenario-Planning Method for Cost Estimation Using Morphological Analysis. Advances in Civil Engineering No. 2019 (2019), pp.1-10.
https://search.emarefa.net/detail/BIM-1116364

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Ji, Sae-Hyun& Ahn, Joseph. Scenario-Planning Method for Cost Estimation Using Morphological Analysis. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1116364

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1116364