Implementing Fuzzy TOPSIS on Project Risk Variable Ranking
المؤلفون المشاركون
Husin, Saiful
Mubarak, Mubarak
Fachrurrazi, Fachrurrazi
Rizalihadi, Maimun
المصدر
العدد
المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-10، 10ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2019-07-08
دولة النشر
مصر
عدد الصفحات
10
التخصصات الرئيسية
الملخص EN
Managing construction risks with a large number of risks with small impact can increase the additional effort and cost of inefficient construction.
Therefore the variables need to be eliminated.
The aim of this study is ranking the risk variable based on its frequency of occurrence by integrating time, cost, and quality criteria simultaneously and selecting the top ten variables with the order of the most significant impact.
The risk variable ranking based on triple project objective of cost, time, and quality simultaneously is a challenge for particular projects or regions contributing to the risk context.
A number of 127 qualitative risk variables of 14 factors occurring in a project to be eliminated require a method/technique.
A fuzzy TOPSIS method involving linguistics data is proposed to capture vague conditions.
Results show that the top ten rankings of risk variables based on integrating the different weights of cost, time, and quality are successfully identified by concluding that the labour factor is the most dominant variable affecting project risk in context the rehabilitation and reconstruction posttsunami disaster, especially in Aceh-Indonesia.
The variables are lack of labour, unskilled labour, undisciplined labour, and low productivity of labour.
This condition can differ from different risk contexts.
This research is different from other studies that only review cost, time, and quality separately.
We stated that to integrate all three criteria of cost, time, and quality simultaneously is more logic to analyze risk variable ranking.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Husin, Saiful& Fachrurrazi, Fachrurrazi& Rizalihadi, Maimun& Mubarak, Mubarak. 2019. Implementing Fuzzy TOPSIS on Project Risk Variable Ranking. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1117487
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Husin, Saiful…[et al.]. Implementing Fuzzy TOPSIS on Project Risk Variable Ranking. Advances in Civil Engineering No. 2019 (2019), pp.1-10.
https://search.emarefa.net/detail/BIM-1117487
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Husin, Saiful& Fachrurrazi, Fachrurrazi& Rizalihadi, Maimun& Mubarak, Mubarak. Implementing Fuzzy TOPSIS on Project Risk Variable Ranking. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1117487
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1117487
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر