Implementing Fuzzy TOPSIS on Project Risk Variable Ranking

Joint Authors

Husin, Saiful
Mubarak, Mubarak
Fachrurrazi, Fachrurrazi
Rizalihadi, Maimun

Source

Advances in Civil Engineering

Issue

Vol. 2019, Issue 2019 (31 Dec. 2019), pp.1-10, 10 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2019-07-08

Country of Publication

Egypt

No. of Pages

10

Main Subjects

Civil Engineering

Abstract EN

Managing construction risks with a large number of risks with small impact can increase the additional effort and cost of inefficient construction.

Therefore the variables need to be eliminated.

The aim of this study is ranking the risk variable based on its frequency of occurrence by integrating time, cost, and quality criteria simultaneously and selecting the top ten variables with the order of the most significant impact.

The risk variable ranking based on triple project objective of cost, time, and quality simultaneously is a challenge for particular projects or regions contributing to the risk context.

A number of 127 qualitative risk variables of 14 factors occurring in a project to be eliminated require a method/technique.

A fuzzy TOPSIS method involving linguistics data is proposed to capture vague conditions.

Results show that the top ten rankings of risk variables based on integrating the different weights of cost, time, and quality are successfully identified by concluding that the labour factor is the most dominant variable affecting project risk in context the rehabilitation and reconstruction posttsunami disaster, especially in Aceh-Indonesia.

The variables are lack of labour, unskilled labour, undisciplined labour, and low productivity of labour.

This condition can differ from different risk contexts.

This research is different from other studies that only review cost, time, and quality separately.

We stated that to integrate all three criteria of cost, time, and quality simultaneously is more logic to analyze risk variable ranking.

American Psychological Association (APA)

Husin, Saiful& Fachrurrazi, Fachrurrazi& Rizalihadi, Maimun& Mubarak, Mubarak. 2019. Implementing Fuzzy TOPSIS on Project Risk Variable Ranking. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1117487

Modern Language Association (MLA)

Husin, Saiful…[et al.]. Implementing Fuzzy TOPSIS on Project Risk Variable Ranking. Advances in Civil Engineering No. 2019 (2019), pp.1-10.
https://search.emarefa.net/detail/BIM-1117487

American Medical Association (AMA)

Husin, Saiful& Fachrurrazi, Fachrurrazi& Rizalihadi, Maimun& Mubarak, Mubarak. Implementing Fuzzy TOPSIS on Project Risk Variable Ranking. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1117487

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1117487