![](/images/graphics-bg.png)
Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption
المؤلفون المشاركون
Assia, Sadiqi
El Abbassi, Ikram
El Barkany, Abdellah
Darcherif, Moumen
El Biyaali, Ahmed
المصدر
Advances in Operations Research
العدد
المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-9، 9ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2020-04-14
دولة النشر
مصر
عدد الصفحات
9
التخصصات الرئيسية
تكنولوجيا المعلومات وعلم الحاسوب
الملخص EN
The success of an industry today depends on its ability to innovate.
In terms of energy performance, this innovation is reflected in the ability of manufacturers to implement new solutions or technologies that enable better energy management.
In this regard, this paper aims to address this gap by incorporating energy consumption as an explicit criterion in flowshop scheduling of jobs and flexible preventive maintenance.
Leveraging the variable speed of machining operations leading to different energy consumption levels, we explore the potential for energy saving in manufacturing.
We develop a mixed integer linear multiobjective optimization model for minimizing the makespan and the total energy consumption.
In the literature, no papers considering both production scheduling and flexible periods of maintenance with minimizing both objective the total of energy consumption in flowshop and makespan.
The performance of the proposed mixed binary integer programming model is evaluated based on the exact method of branch and bound algorithm.
A study of the results proved the performance of the model developed.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Assia, Sadiqi& El Abbassi, Ikram& El Barkany, Abdellah& Darcherif, Moumen& El Biyaali, Ahmed. 2020. Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption. Advances in Operations Research،Vol. 2020, no. 2020, pp.1-9.
https://search.emarefa.net/detail/BIM-1129769
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Assia, Sadiqi…[et al.]. Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption. Advances in Operations Research No. 2020 (2020), pp.1-9.
https://search.emarefa.net/detail/BIM-1129769
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Assia, Sadiqi& El Abbassi, Ikram& El Barkany, Abdellah& Darcherif, Moumen& El Biyaali, Ahmed. Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption. Advances in Operations Research. 2020. Vol. 2020, no. 2020, pp.1-9.
https://search.emarefa.net/detail/BIM-1129769
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1129769
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)