Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption

Joint Authors

Assia, Sadiqi
El Abbassi, Ikram
El Barkany, Abdellah
Darcherif, Moumen
El Biyaali, Ahmed

Source

Advances in Operations Research

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-9, 9 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-04-14

Country of Publication

Egypt

No. of Pages

9

Main Subjects

Information Technology and Computer Science

Abstract EN

The success of an industry today depends on its ability to innovate.

In terms of energy performance, this innovation is reflected in the ability of manufacturers to implement new solutions or technologies that enable better energy management.

In this regard, this paper aims to address this gap by incorporating energy consumption as an explicit criterion in flowshop scheduling of jobs and flexible preventive maintenance.

Leveraging the variable speed of machining operations leading to different energy consumption levels, we explore the potential for energy saving in manufacturing.

We develop a mixed integer linear multiobjective optimization model for minimizing the makespan and the total energy consumption.

In the literature, no papers considering both production scheduling and flexible periods of maintenance with minimizing both objective the total of energy consumption in flowshop and makespan.

The performance of the proposed mixed binary integer programming model is evaluated based on the exact method of branch and bound algorithm.

A study of the results proved the performance of the model developed.

American Psychological Association (APA)

Assia, Sadiqi& El Abbassi, Ikram& El Barkany, Abdellah& Darcherif, Moumen& El Biyaali, Ahmed. 2020. Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption. Advances in Operations Research،Vol. 2020, no. 2020, pp.1-9.
https://search.emarefa.net/detail/BIM-1129769

Modern Language Association (MLA)

Assia, Sadiqi…[et al.]. Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption. Advances in Operations Research No. 2020 (2020), pp.1-9.
https://search.emarefa.net/detail/BIM-1129769

American Medical Association (AMA)

Assia, Sadiqi& El Abbassi, Ikram& El Barkany, Abdellah& Darcherif, Moumen& El Biyaali, Ahmed. Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption. Advances in Operations Research. 2020. Vol. 2020, no. 2020, pp.1-9.
https://search.emarefa.net/detail/BIM-1129769

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1129769