A Robust Two-Machine Flow-Shop Scheduling Model with Scenario-Dependent Processing Times

المؤلفون المشاركون

Wu, Chin-Chia
Lin, Win-Chin
Duan, Lini
Hsu, Chia-Lun
Liao, Jan-Ray
Chen, Juin-Han

المصدر

Discrete Dynamics in Nature and Society

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-16، 16ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-06-13

دولة النشر

مصر

عدد الصفحات

16

التخصصات الرئيسية

الرياضيات

الملخص EN

In many scheduling studies, researchers consider the processing times of jobs as constant numbers.

This assumption sometimes is at odds with practical manufacturing process due to several sources of uncertainties arising from real-life situations.

Examples are the changing working environments, machine breakdowns, tool quality variations and unavailability, and so on.

In light of the phenomenon of scenario-dependent processing times existing in many applications, this paper proposes to incorporate scenario-dependent processing times into a two-machine flow-shop environment with the objective of minimizing the total completion time.

The problem under consideration is never explored.

To solve it, we first derive a lower bound and two optimality properties to enhance the searching efficiency of a branch-and-bound method.

Then, we propose 12 simple heuristics and their corresponding counterparts improved by a pairwise interchange method.

Furthermore, we set proposed 12 simple heuristics as the 12 initial seeds to design 12 variants of a cloud theory-based simulated annealing (CSA) algorithm.

Finally, we conduct simulations and report the performances of the proposed branch-and-bound method, the 12 heuristics, and the 12 variants of CSA algorithm.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Hsu, Chia-Lun& Lin, Win-Chin& Duan, Lini& Liao, Jan-Ray& Wu, Chin-Chia& Chen, Juin-Han. 2020. A Robust Two-Machine Flow-Shop Scheduling Model with Scenario-Dependent Processing Times. Discrete Dynamics in Nature and Society،Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1152985

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Hsu, Chia-Lun…[et al.]. A Robust Two-Machine Flow-Shop Scheduling Model with Scenario-Dependent Processing Times. Discrete Dynamics in Nature and Society No. 2020 (2020), pp.1-16.
https://search.emarefa.net/detail/BIM-1152985

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Hsu, Chia-Lun& Lin, Win-Chin& Duan, Lini& Liao, Jan-Ray& Wu, Chin-Chia& Chen, Juin-Han. A Robust Two-Machine Flow-Shop Scheduling Model with Scenario-Dependent Processing Times. Discrete Dynamics in Nature and Society. 2020. Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1152985

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1152985