A Robust Two-Machine Flow-Shop Scheduling Model with Scenario-Dependent Processing Times

Joint Authors

Wu, Chin-Chia
Lin, Win-Chin
Duan, Lini
Hsu, Chia-Lun
Liao, Jan-Ray
Chen, Juin-Han

Source

Discrete Dynamics in Nature and Society

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-16, 16 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-06-13

Country of Publication

Egypt

No. of Pages

16

Main Subjects

Mathematics

Abstract EN

In many scheduling studies, researchers consider the processing times of jobs as constant numbers.

This assumption sometimes is at odds with practical manufacturing process due to several sources of uncertainties arising from real-life situations.

Examples are the changing working environments, machine breakdowns, tool quality variations and unavailability, and so on.

In light of the phenomenon of scenario-dependent processing times existing in many applications, this paper proposes to incorporate scenario-dependent processing times into a two-machine flow-shop environment with the objective of minimizing the total completion time.

The problem under consideration is never explored.

To solve it, we first derive a lower bound and two optimality properties to enhance the searching efficiency of a branch-and-bound method.

Then, we propose 12 simple heuristics and their corresponding counterparts improved by a pairwise interchange method.

Furthermore, we set proposed 12 simple heuristics as the 12 initial seeds to design 12 variants of a cloud theory-based simulated annealing (CSA) algorithm.

Finally, we conduct simulations and report the performances of the proposed branch-and-bound method, the 12 heuristics, and the 12 variants of CSA algorithm.

American Psychological Association (APA)

Hsu, Chia-Lun& Lin, Win-Chin& Duan, Lini& Liao, Jan-Ray& Wu, Chin-Chia& Chen, Juin-Han. 2020. A Robust Two-Machine Flow-Shop Scheduling Model with Scenario-Dependent Processing Times. Discrete Dynamics in Nature and Society،Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1152985

Modern Language Association (MLA)

Hsu, Chia-Lun…[et al.]. A Robust Two-Machine Flow-Shop Scheduling Model with Scenario-Dependent Processing Times. Discrete Dynamics in Nature and Society No. 2020 (2020), pp.1-16.
https://search.emarefa.net/detail/BIM-1152985

American Medical Association (AMA)

Hsu, Chia-Lun& Lin, Win-Chin& Duan, Lini& Liao, Jan-Ray& Wu, Chin-Chia& Chen, Juin-Han. A Robust Two-Machine Flow-Shop Scheduling Model with Scenario-Dependent Processing Times. Discrete Dynamics in Nature and Society. 2020. Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1152985

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1152985