Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México

المؤلفون المشاركون

Ferreira García, Karen Y.
de la Riva Rodriguez, Jorge
Sánchez Leal, Jaime
Reyes-Martínez, Rosa M.
Prieto, Arturo Woocay

المصدر

Journal of Engineering

العدد

المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-6، 6ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2019-03-13

دولة النشر

مصر

عدد الصفحات

6

التخصصات الرئيسية

هندسة مدنية

الملخص EN

We propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers.

The current production line presents a high rate of personnel turnover and absenteeism and with an AT value established by the company of 6.3%.

The AT determination is of critical importance, given that through this the workers need to maintain their work rhythm at 100% during the entire workday without fatigue.

The resulting allowance after the study was 15% instead of 6.3%, increasing the standard time and causing a decrease in personnel turnover and absenteeism and consequently increasing the production capacity and the reduction of costs.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Ferreira García, Karen Y.& de la Riva Rodriguez, Jorge& Sánchez Leal, Jaime& Reyes-Martínez, Rosa M.& Prieto, Arturo Woocay. 2019. Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México. Journal of Engineering،Vol. 2019, no. 2019, pp.1-6.
https://search.emarefa.net/detail/BIM-1173510

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Ferreira García, Karen Y.…[et al.]. Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México. Journal of Engineering No. 2019 (2019), pp.1-6.
https://search.emarefa.net/detail/BIM-1173510

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Ferreira García, Karen Y.& de la Riva Rodriguez, Jorge& Sánchez Leal, Jaime& Reyes-Martínez, Rosa M.& Prieto, Arturo Woocay. Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México. Journal of Engineering. 2019. Vol. 2019, no. 2019, pp.1-6.
https://search.emarefa.net/detail/BIM-1173510

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1173510