Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México

Joint Authors

Ferreira García, Karen Y.
de la Riva Rodriguez, Jorge
Sánchez Leal, Jaime
Reyes-Martínez, Rosa M.
Prieto, Arturo Woocay

Source

Journal of Engineering

Issue

Vol. 2019, Issue 2019 (31 Dec. 2019), pp.1-6, 6 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2019-03-13

Country of Publication

Egypt

No. of Pages

6

Main Subjects

Civil Engineering

Abstract EN

We propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers.

The current production line presents a high rate of personnel turnover and absenteeism and with an AT value established by the company of 6.3%.

The AT determination is of critical importance, given that through this the workers need to maintain their work rhythm at 100% during the entire workday without fatigue.

The resulting allowance after the study was 15% instead of 6.3%, increasing the standard time and causing a decrease in personnel turnover and absenteeism and consequently increasing the production capacity and the reduction of costs.

American Psychological Association (APA)

Ferreira García, Karen Y.& de la Riva Rodriguez, Jorge& Sánchez Leal, Jaime& Reyes-Martínez, Rosa M.& Prieto, Arturo Woocay. 2019. Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México. Journal of Engineering،Vol. 2019, no. 2019, pp.1-6.
https://search.emarefa.net/detail/BIM-1173510

Modern Language Association (MLA)

Ferreira García, Karen Y.…[et al.]. Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México. Journal of Engineering No. 2019 (2019), pp.1-6.
https://search.emarefa.net/detail/BIM-1173510

American Medical Association (AMA)

Ferreira García, Karen Y.& de la Riva Rodriguez, Jorge& Sánchez Leal, Jaime& Reyes-Martínez, Rosa M.& Prieto, Arturo Woocay. Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México. Journal of Engineering. 2019. Vol. 2019, no. 2019, pp.1-6.
https://search.emarefa.net/detail/BIM-1173510

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1173510