Nonlinear Forecasting Model regarding Evolutional Risk of the PPP Project

المؤلف

Gao, Wu

المصدر

Journal of Advanced Transportation

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-9، 9ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-10-14

دولة النشر

مصر

عدد الصفحات

9

التخصصات الرئيسية

هندسة مدنية

الملخص EN

The special topic of this paper is to build a nonlinear measuring model between PPP project risk and multiple variables and test it through case analysis.

Nonlinear regression method was used in this research to study the risk mutation of public-private partnership (PPP) projects without any significant events.

Risk evolution is influenced by three factors which include (1) macroscopic environment, (2) micro environment, and (3) subject’s capacity and their cooperative relationship.

First, it reveals three main drive variables of project risk evolution through case analysis.

Second, it builds a nonlinear time-varying measurement model which is then transformed to a classical regression model.

Lastly, it estimates and tests the model parameter by an example.

The study shows that there is an integral negative correlation among the three independent variables within a certain threshold range, revealing macro environment as the most significant factor of project risk.

Analyzing the complex relationship between multiple impact variables and risk evolution of PPP projects can provide a basic tool for forecasting and control of risk.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Gao, Wu. 2018. Nonlinear Forecasting Model regarding Evolutional Risk of the PPP Project. Journal of Advanced Transportation،Vol. 2018, no. 2018, pp.1-9.
https://search.emarefa.net/detail/BIM-1181202

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Gao, Wu. Nonlinear Forecasting Model regarding Evolutional Risk of the PPP Project. Journal of Advanced Transportation No. 2018 (2018), pp.1-9.
https://search.emarefa.net/detail/BIM-1181202

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Gao, Wu. Nonlinear Forecasting Model regarding Evolutional Risk of the PPP Project. Journal of Advanced Transportation. 2018. Vol. 2018, no. 2018, pp.1-9.
https://search.emarefa.net/detail/BIM-1181202

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1181202