Nonlinear Forecasting Model regarding Evolutional Risk of the PPP Project

Author

Gao, Wu

Source

Journal of Advanced Transportation

Issue

Vol. 2018, Issue 2018 (31 Dec. 2018), pp.1-9, 9 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2018-10-14

Country of Publication

Egypt

No. of Pages

9

Main Subjects

Civil Engineering

Abstract EN

The special topic of this paper is to build a nonlinear measuring model between PPP project risk and multiple variables and test it through case analysis.

Nonlinear regression method was used in this research to study the risk mutation of public-private partnership (PPP) projects without any significant events.

Risk evolution is influenced by three factors which include (1) macroscopic environment, (2) micro environment, and (3) subject’s capacity and their cooperative relationship.

First, it reveals three main drive variables of project risk evolution through case analysis.

Second, it builds a nonlinear time-varying measurement model which is then transformed to a classical regression model.

Lastly, it estimates and tests the model parameter by an example.

The study shows that there is an integral negative correlation among the three independent variables within a certain threshold range, revealing macro environment as the most significant factor of project risk.

Analyzing the complex relationship between multiple impact variables and risk evolution of PPP projects can provide a basic tool for forecasting and control of risk.

American Psychological Association (APA)

Gao, Wu. 2018. Nonlinear Forecasting Model regarding Evolutional Risk of the PPP Project. Journal of Advanced Transportation،Vol. 2018, no. 2018, pp.1-9.
https://search.emarefa.net/detail/BIM-1181202

Modern Language Association (MLA)

Gao, Wu. Nonlinear Forecasting Model regarding Evolutional Risk of the PPP Project. Journal of Advanced Transportation No. 2018 (2018), pp.1-9.
https://search.emarefa.net/detail/BIM-1181202

American Medical Association (AMA)

Gao, Wu. Nonlinear Forecasting Model regarding Evolutional Risk of the PPP Project. Journal of Advanced Transportation. 2018. Vol. 2018, no. 2018, pp.1-9.
https://search.emarefa.net/detail/BIM-1181202

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1181202