Investment Payback Period Calculating Model for Airport Bridge Facility

المؤلفون المشاركون

Wan, Jian
Xia, Zheng-hong
Zhu, Xin-ping

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-7، 7ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-08-12

دولة النشر

مصر

عدد الصفحات

7

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Due to the uncertainty and difficulty of estimating the investment payback period of the airport bridge facility, a model for calculating the investment payback period of bridge facility is proposed in this paper from the perspective of airport routine operation.

Based on the actual operational data of Kunming Changshui Airport, Wuhan Tianhe Airport, and Lijiang Sanyi Airport in 2018, the factors influencing the payback period of bridge facility are the number of bridge facilities and service time, which have been discussed in this paper.

According to the simulation, it is concluded that the number of bridge facilities and service time are the key points to the length of the investment payback period, and the annual operating cost of the airline can be saved quite a lot.

The research results can be used to assist the leaders’ decision-making of airports and airlines for the promotion of the service of bridge facilities.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Wan, Jian& Xia, Zheng-hong& Zhu, Xin-ping. 2020. Investment Payback Period Calculating Model for Airport Bridge Facility. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1202443

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Wan, Jian…[et al.]. Investment Payback Period Calculating Model for Airport Bridge Facility. Mathematical Problems in Engineering No. 2020 (2020), pp.1-7.
https://search.emarefa.net/detail/BIM-1202443

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Wan, Jian& Xia, Zheng-hong& Zhu, Xin-ping. Investment Payback Period Calculating Model for Airport Bridge Facility. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1202443

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1202443