Investment Payback Period Calculating Model for Airport Bridge Facility

Joint Authors

Wan, Jian
Xia, Zheng-hong
Zhu, Xin-ping

Source

Mathematical Problems in Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-7, 7 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-08-12

Country of Publication

Egypt

No. of Pages

7

Main Subjects

Civil Engineering

Abstract EN

Due to the uncertainty and difficulty of estimating the investment payback period of the airport bridge facility, a model for calculating the investment payback period of bridge facility is proposed in this paper from the perspective of airport routine operation.

Based on the actual operational data of Kunming Changshui Airport, Wuhan Tianhe Airport, and Lijiang Sanyi Airport in 2018, the factors influencing the payback period of bridge facility are the number of bridge facilities and service time, which have been discussed in this paper.

According to the simulation, it is concluded that the number of bridge facilities and service time are the key points to the length of the investment payback period, and the annual operating cost of the airline can be saved quite a lot.

The research results can be used to assist the leaders’ decision-making of airports and airlines for the promotion of the service of bridge facilities.

American Psychological Association (APA)

Wan, Jian& Xia, Zheng-hong& Zhu, Xin-ping. 2020. Investment Payback Period Calculating Model for Airport Bridge Facility. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1202443

Modern Language Association (MLA)

Wan, Jian…[et al.]. Investment Payback Period Calculating Model for Airport Bridge Facility. Mathematical Problems in Engineering No. 2020 (2020), pp.1-7.
https://search.emarefa.net/detail/BIM-1202443

American Medical Association (AMA)

Wan, Jian& Xia, Zheng-hong& Zhu, Xin-ping. Investment Payback Period Calculating Model for Airport Bridge Facility. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1202443

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1202443