Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time
المؤلفون المشاركون
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-10، 10ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2018-04-15
دولة النشر
مصر
عدد الصفحات
10
التخصصات الرئيسية
الملخص EN
An extension of the integrated production-delivery lot sizing model with limited production capacity and transportation cost is investigated.
We introduce the factor of overtime work into the model to improve the manufacturer’s production.
In addition, when finishing a lot, the manufacturer has maintenance time to maintain and repair equipment for ensuring that the supply chain is operating continuously.
By analyzing the integrated model, the solution procedure is provided to determine the optimal delivery and order policy.
We conduct a numerical experiment and give sensitive analysis by varying some parameters to illustrate the problem and its solution procedure.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Zhang, Ren-Qian& Sun, Xuefang. 2018. Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-10.
https://search.emarefa.net/detail/BIM-1205680
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Zhang, Ren-Qian& Sun, Xuefang. Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time. Mathematical Problems in Engineering No. 2018 (2018), pp.1-10.
https://search.emarefa.net/detail/BIM-1205680
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Zhang, Ren-Qian& Sun, Xuefang. Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-10.
https://search.emarefa.net/detail/BIM-1205680
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1205680
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر