Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time

Joint Authors

Zhang, Ren-Qian
Sun, Xuefang

Source

Mathematical Problems in Engineering

Issue

Vol. 2018, Issue 2018 (31 Dec. 2018), pp.1-10, 10 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2018-04-15

Country of Publication

Egypt

No. of Pages

10

Main Subjects

Civil Engineering

Abstract EN

An extension of the integrated production-delivery lot sizing model with limited production capacity and transportation cost is investigated.

We introduce the factor of overtime work into the model to improve the manufacturer’s production.

In addition, when finishing a lot, the manufacturer has maintenance time to maintain and repair equipment for ensuring that the supply chain is operating continuously.

By analyzing the integrated model, the solution procedure is provided to determine the optimal delivery and order policy.

We conduct a numerical experiment and give sensitive analysis by varying some parameters to illustrate the problem and its solution procedure.

American Psychological Association (APA)

Zhang, Ren-Qian& Sun, Xuefang. 2018. Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-10.
https://search.emarefa.net/detail/BIM-1205680

Modern Language Association (MLA)

Zhang, Ren-Qian& Sun, Xuefang. Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time. Mathematical Problems in Engineering No. 2018 (2018), pp.1-10.
https://search.emarefa.net/detail/BIM-1205680

American Medical Association (AMA)

Zhang, Ren-Qian& Sun, Xuefang. Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-10.
https://search.emarefa.net/detail/BIM-1205680

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1205680