Supply Chain Cost Prediction for Prefabricated Building Construction under Uncertainty

المؤلفون المشاركون

Wang, Shaoli
Mursalin, Yasir
Lin, Gang
Lin, Conghua

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-5، 5ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-10-18

دولة النشر

مصر

عدد الصفحات

5

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This paper considers the problem of predicting a supply chain cost for prefabricated building construction under an uncertain situation.

Based on the Activity-Based Costing (ABC) method, we establish a computational model to estimate the total cost of the prefabricated supply chain.

The model can assist in not only finding the critical areas for cost reduction of the whole supply chain but also analyzing other costs of prefabricated construction projects.

Furthermore, we provide a numerical example of prefabricated building construction to validate the results.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Wang, Shaoli& Mursalin, Yasir& Lin, Gang& Lin, Conghua. 2018. Supply Chain Cost Prediction for Prefabricated Building Construction under Uncertainty. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-5.
https://search.emarefa.net/detail/BIM-1207519

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Wang, Shaoli…[et al.]. Supply Chain Cost Prediction for Prefabricated Building Construction under Uncertainty. Mathematical Problems in Engineering No. 2018 (2018), pp.1-5.
https://search.emarefa.net/detail/BIM-1207519

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Wang, Shaoli& Mursalin, Yasir& Lin, Gang& Lin, Conghua. Supply Chain Cost Prediction for Prefabricated Building Construction under Uncertainty. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-5.
https://search.emarefa.net/detail/BIM-1207519

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1207519