Supply Chain Cost Prediction for Prefabricated Building Construction under Uncertainty
Joint Authors
Wang, Shaoli
Mursalin, Yasir
Lin, Gang
Lin, Conghua
Source
Mathematical Problems in Engineering
Issue
Vol. 2018, Issue 2018 (31 Dec. 2018), pp.1-5, 5 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2018-10-18
Country of Publication
Egypt
No. of Pages
5
Main Subjects
Abstract EN
This paper considers the problem of predicting a supply chain cost for prefabricated building construction under an uncertain situation.
Based on the Activity-Based Costing (ABC) method, we establish a computational model to estimate the total cost of the prefabricated supply chain.
The model can assist in not only finding the critical areas for cost reduction of the whole supply chain but also analyzing other costs of prefabricated construction projects.
Furthermore, we provide a numerical example of prefabricated building construction to validate the results.
American Psychological Association (APA)
Wang, Shaoli& Mursalin, Yasir& Lin, Gang& Lin, Conghua. 2018. Supply Chain Cost Prediction for Prefabricated Building Construction under Uncertainty. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-5.
https://search.emarefa.net/detail/BIM-1207519
Modern Language Association (MLA)
Wang, Shaoli…[et al.]. Supply Chain Cost Prediction for Prefabricated Building Construction under Uncertainty. Mathematical Problems in Engineering No. 2018 (2018), pp.1-5.
https://search.emarefa.net/detail/BIM-1207519
American Medical Association (AMA)
Wang, Shaoli& Mursalin, Yasir& Lin, Gang& Lin, Conghua. Supply Chain Cost Prediction for Prefabricated Building Construction under Uncertainty. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-5.
https://search.emarefa.net/detail/BIM-1207519
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1207519