Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method

المؤلف

Zhang, Song

المصدر

Scientific Programming

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-7، 7ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-08-28

دولة النشر

مصر

عدد الصفحات

7

التخصصات الرئيسية

الرياضيات

الملخص EN

A multimode resource-constrained project scheduling problem (MRCPSP) may have multifeasible solutions, due to its nature of targeting multiobjectives.

Given the NP-hard MRCPSP and intricate multiobjective algorithms, finding the optimized result among those solutions seems impossible.

This paper adopts data envelopment analysis (DEA) to evaluate a series of solutions of an MRCPSP and to find an appropriate choice in an objective way.

Our approach is applied to a typical MRCPSP in practice, and the results validate that DEA is an effective and objective method for MRCPSP solution selection.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zhang, Song. 2020. Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method. Scientific Programming،Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1208992

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zhang, Song. Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method. Scientific Programming No. 2020 (2020), pp.1-7.
https://search.emarefa.net/detail/BIM-1208992

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zhang, Song. Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method. Scientific Programming. 2020. Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1208992

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1208992