Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method
Author
Source
Issue
Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-7, 7 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2020-08-28
Country of Publication
Egypt
No. of Pages
7
Main Subjects
Abstract EN
A multimode resource-constrained project scheduling problem (MRCPSP) may have multifeasible solutions, due to its nature of targeting multiobjectives.
Given the NP-hard MRCPSP and intricate multiobjective algorithms, finding the optimized result among those solutions seems impossible.
This paper adopts data envelopment analysis (DEA) to evaluate a series of solutions of an MRCPSP and to find an appropriate choice in an objective way.
Our approach is applied to a typical MRCPSP in practice, and the results validate that DEA is an effective and objective method for MRCPSP solution selection.
American Psychological Association (APA)
Zhang, Song. 2020. Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method. Scientific Programming،Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1208992
Modern Language Association (MLA)
Zhang, Song. Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method. Scientific Programming No. 2020 (2020), pp.1-7.
https://search.emarefa.net/detail/BIM-1208992
American Medical Association (AMA)
Zhang, Song. Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method. Scientific Programming. 2020. Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1208992
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1208992