Optimizing cash flow of construction projects through different bid pricing schemes
المؤلفون المشاركون
Sanad, Haytham M.
Itman, Imad al-Sayyid
Jabir, Muhammad M.
Marzuq, Muhammad M.
المصدر
Journal of Engineering Research
العدد
المجلد 2019، العدد 3، ج. 2 (30 يونيو/حزيران 2019)، ص ص. 66-75، 10ص.
الناشر
تاريخ النشر
2019-06-30
دولة النشر
مصر
عدد الصفحات
10
التخصصات الرئيسية
الموضوعات
الملخص EN
Successful construction projects should meet the planning and design objectives within budget and time constraints.
Planning and scheduling for the construction projects and their resources are essential tasks for overall project success.
Cash, in particular, is an important resource for construction companies.
It is worth noting that while pricing bill of quantities in unit price contracts, the contractor might ignore the related cash flow which may be insufficient for contractor.
Further, the resulted financial threats also might be ignored.
Therefore, it is important for the contractor to have an overall optimized system to improve all financial aspects related to the contract.
This paper presents a cash flow optimization model that aims at maximizing cumulative concurrent investment profit (CCIP) and minimizing maximum monthly overdrafts (OMax).
The model utilizes Genetic Algorithms for optimization.
The performance of the developed model is validated using an actual case study of "Beni Suef Power Station Project" located in Beni Suef, Egypt.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Jabir, Muhammad M.& Itman, Imad al-Sayyid& Sanad, Haytham M.& Marzuq, Muhammad M.. 2019. Optimizing cash flow of construction projects through different bid pricing schemes. Journal of Engineering Research،Vol. 2019, no. 3، ج. 2, pp.66-75.
https://search.emarefa.net/detail/BIM-1363932
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Jabir, Muhammad M.…[et al.]. Optimizing cash flow of construction projects through different bid pricing schemes. Journal of Engineering Research No. 3, p. 2 (Jun. 2019), pp.66-75.
https://search.emarefa.net/detail/BIM-1363932
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Jabir, Muhammad M.& Itman, Imad al-Sayyid& Sanad, Haytham M.& Marzuq, Muhammad M.. Optimizing cash flow of construction projects through different bid pricing schemes. Journal of Engineering Research. 2019. Vol. 2019, no. 3، ج. 2, pp.66-75.
https://search.emarefa.net/detail/BIM-1363932
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references : p. 74-75
رقم السجل
BIM-1363932
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر