Optimizing cash flow of construction projects through different bid pricing schemes

Joint Authors

Sanad, Haytham M.
Itman, Imad al-Sayyid
Jabir, Muhammad M.
Marzuq, Muhammad M.

Source

Journal of Engineering Research

Issue

Vol. 2019, Issue 3، ج. 2 (30 Jun. 2019), pp.66-75, 10 p.

Publisher

Tanta University Faculty of Engineering

Publication Date

2019-06-30

Country of Publication

Egypt

No. of Pages

10

Main Subjects

Civil Engineering

Topics

Abstract EN

Successful construction projects should meet the planning and design objectives within budget and time constraints.

Planning and scheduling for the construction projects and their resources are essential tasks for overall project success.

Cash, in particular, is an important resource for construction companies.

It is worth noting that while pricing bill of quantities in unit price contracts, the contractor might ignore the related cash flow which may be insufficient for contractor.

Further, the resulted financial threats also might be ignored.

Therefore, it is important for the contractor to have an overall optimized system to improve all financial aspects related to the contract.

This paper presents a cash flow optimization model that aims at maximizing cumulative concurrent investment profit (CCIP) and minimizing maximum monthly overdrafts (OMax).

The model utilizes Genetic Algorithms for optimization.

The performance of the developed model is validated using an actual case study of "Beni Suef Power Station Project" located in Beni Suef, Egypt.

American Psychological Association (APA)

Jabir, Muhammad M.& Itman, Imad al-Sayyid& Sanad, Haytham M.& Marzuq, Muhammad M.. 2019. Optimizing cash flow of construction projects through different bid pricing schemes. Journal of Engineering Research،Vol. 2019, no. 3، ج. 2, pp.66-75.
https://search.emarefa.net/detail/BIM-1363932

Modern Language Association (MLA)

Jabir, Muhammad M.…[et al.]. Optimizing cash flow of construction projects through different bid pricing schemes. Journal of Engineering Research No. 3, p. 2 (Jun. 2019), pp.66-75.
https://search.emarefa.net/detail/BIM-1363932

American Medical Association (AMA)

Jabir, Muhammad M.& Itman, Imad al-Sayyid& Sanad, Haytham M.& Marzuq, Muhammad M.. Optimizing cash flow of construction projects through different bid pricing schemes. Journal of Engineering Research. 2019. Vol. 2019, no. 3، ج. 2, pp.66-75.
https://search.emarefa.net/detail/BIM-1363932

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 74-75

Record ID

BIM-1363932