Time-cost tradeoff and resource-scheduling problems in construction : a state-of-the-art review
المؤلفون المشاركون
Sanad, Haytham M.
Itman, Imad al-Sayyid
al-Killini, Ali Fathi
المصدر
Journal of Engineering Research
العدد
المجلد 6، العدد 5 (31 ديسمبر/كانون الأول 2022)، ص ص. 64-74، 11ص.
الناشر
تاريخ النشر
2022-12-31
دولة النشر
مصر
عدد الصفحات
11
التخصصات الرئيسية
الموضوعات
الملخص EN
Duration, cost, and resources are defined as constraints in projects.
consequently, construction manager needs to balance between theses constraints to ensure that project objectives are met.
choosing the best alternative of each activity is one of the most significant problems in construction management to minimize project duration, project cost and also satisfies resources constraints as well as smoothing resources.
advanced computer technologies could empower construction engineers and project managers to make right, fast and applicable decisions based on accurate data that can be studied, optimized, and quantified with great accuracy.
this article strives to find the recent improvements of resource-scheduling problems and time-cost trade off and the interacting between them which can be used in innovating new approaches in construction management.
to achieve this goal, a state-of-the-art review, is conducted as a literature sample including articles implying three areas of research ; time-cost trade off, constrained resources and unconstrained resources.
a content analysis is made to clarify contributions and gaps of knowledge to help suggesting and specifying opportunities for future research.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
al-Killini, Ali Fathi& Sanad, Haytham M.& Itman, Imad al-Sayyid. 2022. Time-cost tradeoff and resource-scheduling problems in construction : a state-of-the-art review. Journal of Engineering Research،Vol. 6, no. 5, pp.64-74.
https://search.emarefa.net/detail/BIM-1454544
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
al-Killini, Ali Fathi…[et al.]. Time-cost tradeoff and resource-scheduling problems in construction : a state-of-the-art review. Journal of Engineering Research Vol. 6, no. 5 (Dec. 2022), pp.64-74.
https://search.emarefa.net/detail/BIM-1454544
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
al-Killini, Ali Fathi& Sanad, Haytham M.& Itman, Imad al-Sayyid. Time-cost tradeoff and resource-scheduling problems in construction : a state-of-the-art review. Journal of Engineering Research. 2022. Vol. 6, no. 5, pp.64-74.
https://search.emarefa.net/detail/BIM-1454544
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references : p. 73-74
رقم السجل
BIM-1454544
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر