Time-cost tradeoff and resource-scheduling problems in construction : a state-of-the-art review

Joint Authors

Sanad, Haytham M.
Itman, Imad al-Sayyid
al-Killini, Ali Fathi

Source

Journal of Engineering Research

Issue

Vol. 6, Issue 5 (31 Dec. 2022), pp.64-74, 11 p.

Publisher

Tanta University Faculty of Engineering

Publication Date

2022-12-31

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Civil Engineering

Topics

Abstract EN

Duration, cost, and resources are defined as constraints in projects.

consequently, construction manager needs to balance between theses constraints to ensure that project objectives are met.

choosing the best alternative of each activity is one of the most significant problems in construction management to minimize project duration, project cost and also satisfies resources constraints as well as smoothing resources.

advanced computer technologies could empower construction engineers and project managers to make right, fast and applicable decisions based on accurate data that can be studied, optimized, and quantified with great accuracy.

this article strives to find the recent improvements of resource-scheduling problems and time-cost trade off and the interacting between them which can be used in innovating new approaches in construction management.

to achieve this goal, a state-of-the-art review, is conducted as a literature sample including articles implying three areas of research ; time-cost trade off, constrained resources and unconstrained resources.

a content analysis is made to clarify contributions and gaps of knowledge to help suggesting and specifying opportunities for future research.

American Psychological Association (APA)

al-Killini, Ali Fathi& Sanad, Haytham M.& Itman, Imad al-Sayyid. 2022. Time-cost tradeoff and resource-scheduling problems in construction : a state-of-the-art review. Journal of Engineering Research،Vol. 6, no. 5, pp.64-74.
https://search.emarefa.net/detail/BIM-1454544

Modern Language Association (MLA)

al-Killini, Ali Fathi…[et al.]. Time-cost tradeoff and resource-scheduling problems in construction : a state-of-the-art review. Journal of Engineering Research Vol. 6, no. 5 (Dec. 2022), pp.64-74.
https://search.emarefa.net/detail/BIM-1454544

American Medical Association (AMA)

al-Killini, Ali Fathi& Sanad, Haytham M.& Itman, Imad al-Sayyid. Time-cost tradeoff and resource-scheduling problems in construction : a state-of-the-art review. Journal of Engineering Research. 2022. Vol. 6, no. 5, pp.64-74.
https://search.emarefa.net/detail/BIM-1454544

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 73-74

Record ID

BIM-1454544