Risk analysis for a BOT project

المؤلفون المشاركون

Bagui, Swapan Kumar
Ghosh, Ambarish

المصدر

Jordan Journal of Civil Engineering

العدد

المجلد 5، العدد 3 (30 سبتمبر/أيلول 2011)، ص ص. 330-342، 13ص.

الناشر

جامعة العلوم و التكنولوجيا الأردنية عمادة البحث العلمي

تاريخ النشر

2011-09-30

دولة النشر

الأردن

عدد الصفحات

13

التخصصات الرئيسية

الهندسة المدنية

الموضوعات

الملخص EN

There are several risks in a BOT project.

Major critical risks are total project cost and revenue / to liable traffic.

This paper presents a sensitivity analysis for a BOT project with a real case study varying equity from 10 % to 90 %.

Traffic and cost are varied ± 20 % and financial analysis is carried out with spread sheet, and test results are prepared in graphical forms and presented.

Total Project Cost (TPC), Net Present Value (NPV) and Financial Internal Rate of Return (FIRR) are plotted with various percentages of equity.

Linear and non-linear graphs are found.

FIRR decreases with increasing TPC / Equity, and probability of project risk increases with increasing percentage of equity up to 30 % and decreases beyond this value.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Bagui, Swapan Kumar& Ghosh, Ambarish. 2011. Risk analysis for a BOT project. Jordan Journal of Civil Engineering،Vol. 5, no. 3, pp.330-342.
https://search.emarefa.net/detail/BIM-284431

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Bagui, Swapan Kumar& Ghosh, Ambarish. Risk analysis for a BOT project. Jordan Journal of Civil Engineering Vol. 5, no. 3 (2011), pp.330-342.
https://search.emarefa.net/detail/BIM-284431

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Bagui, Swapan Kumar& Ghosh, Ambarish. Risk analysis for a BOT project. Jordan Journal of Civil Engineering. 2011. Vol. 5, no. 3, pp.330-342.
https://search.emarefa.net/detail/BIM-284431

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references : p. 342

رقم السجل

BIM-284431