Risk analysis for a BOT project

Joint Authors

Bagui, Swapan Kumar
Ghosh, Ambarish

Source

Jordan Journal of Civil Engineering

Issue

Vol. 5, Issue 3 (30 Sep. 2011), pp.330-342, 13 p.

Publisher

Jordan University of Science and Technology Deanship of Research

Publication Date

2011-09-30

Country of Publication

Jordan

No. of Pages

13

Main Subjects

Civil Engineering

Topics

Abstract EN

There are several risks in a BOT project.

Major critical risks are total project cost and revenue / to liable traffic.

This paper presents a sensitivity analysis for a BOT project with a real case study varying equity from 10 % to 90 %.

Traffic and cost are varied ± 20 % and financial analysis is carried out with spread sheet, and test results are prepared in graphical forms and presented.

Total Project Cost (TPC), Net Present Value (NPV) and Financial Internal Rate of Return (FIRR) are plotted with various percentages of equity.

Linear and non-linear graphs are found.

FIRR decreases with increasing TPC / Equity, and probability of project risk increases with increasing percentage of equity up to 30 % and decreases beyond this value.

American Psychological Association (APA)

Bagui, Swapan Kumar& Ghosh, Ambarish. 2011. Risk analysis for a BOT project. Jordan Journal of Civil Engineering،Vol. 5, no. 3, pp.330-342.
https://search.emarefa.net/detail/BIM-284431

Modern Language Association (MLA)

Bagui, Swapan Kumar& Ghosh, Ambarish. Risk analysis for a BOT project. Jordan Journal of Civil Engineering Vol. 5, no. 3 (2011), pp.330-342.
https://search.emarefa.net/detail/BIM-284431

American Medical Association (AMA)

Bagui, Swapan Kumar& Ghosh, Ambarish. Risk analysis for a BOT project. Jordan Journal of Civil Engineering. 2011. Vol. 5, no. 3, pp.330-342.
https://search.emarefa.net/detail/BIM-284431

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 342

Record ID

BIM-284431