The improvement of operation and maintenance of hydropower plants : a case study of roseires power station

مقدم أطروحة جامعية

al-Tai, Ahmad Abd al-Jalil Hamzah

مشرف أطروحة جامعية

al-Najjar, Uthman Muhammad

الجامعة

جامعة أم درمان الإسلامية

الكلية

كرسي اليونسكو للمياه

دولة الجامعة

السودان

الدرجة العلمية

ماجستير

تاريخ الدرجة العلمية

2005

الملخص الإنجليزي

The main objectives of Improvement of operation and maintenance of hydro–power plants is to sustain adequate capacity during most of the operation hours, to produce maximum generation of electric power, improve the performance of turbine units; to decrease the cost of electric energy generated (KWH) and to increases the share percentage of the total electric power generated. Roseires Power Station, as case study, is the biggest hydroelectric power plant in Sudan.

The plant was founded in 1971, it was equipped with 7 turbine units, with capacity 40 MW for each of Kaplan type, and with a total installed capacity of 280 MW. Over the years Roseires Power Station was suffering because of severe problems and some other factors (such as problems during flood season, problems during dry season as shortage of water, cavitations problems and lack of spare parts problems), which affect the performance of turbine units, and resulted in a great decline in electric power generated (during flood season the power generated decline to 5MW for each Turbine unit ), raise the cost of electric power generated (KWH), and decrease the share percentage of the total energy generated. Since the year 1998, NEC was carrying a great rehabilitation program for improving the performance of Roseires Power Station. This study covers the main aspects related to the Improvement of operation and maintenance of hydropower plants.

In particular, the research concentrates on Roseires Power Station.

The Improvement of operation and maintenance of the plant can be achieved through some aspects and suggestions mentioned in this research.

Applying the proposed plans and suggestions will lead to a sustainable and higher utilization of turbine capacity, increase in the electric power generated, reduction in the cost of electric power, reduction in human accidents, and decreasing the cost of operation and maintenance.

The research contains tables, figures and graphs used to investigate the problems.

Other factors which affect the performance of hydropower plants in general and Roseires Power Station in particular was also mentioned and discussed.

Finally the research concludes with a number of recommendations for improving the performance of Roseires Power Station.

التخصصات الرئيسية

الهندسة الكهربائية

الموضوعات

عدد الصفحات

86

قائمة المحتويات

Table of contents.

Abstract.

Chapter One : Introduction.

Chapter Two : Literature review.

Chapter Three : Hydraulic turbines.

Chapter Four : Improvement of operation and maintenance of hydropower plants.

Chapter Five : Results and discussions.

Chapter Six : Conclusion and recommendations.

References.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

al-Tai, Ahmad Abd al-Jalil Hamzah. (2005). The improvement of operation and maintenance of hydropower plants : a case study of roseires power station. (Master's theses Theses and Dissertations Master). Omdurman Islamic University, Sudan
https://search.emarefa.net/detail/BIM-367708

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

al-Tai, Ahmad Abd al-Jalil Hamzah. The improvement of operation and maintenance of hydropower plants : a case study of roseires power station. (Master's theses Theses and Dissertations Master). Omdurman Islamic University. (2005).
https://search.emarefa.net/detail/BIM-367708

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

al-Tai, Ahmad Abd al-Jalil Hamzah. (2005). The improvement of operation and maintenance of hydropower plants : a case study of roseires power station. (Master's theses Theses and Dissertations Master). Omdurman Islamic University, Sudan
https://search.emarefa.net/detail/BIM-367708

لغة النص

الإنجليزية

نوع البيانات

رسائل جامعية

رقم السجل

BIM-367708