Single Machine Predictive Scheduling Using Inserted Idle Times

المؤلفون المشاركون

Zhu, Hongli
Zhou, Hong

المصدر

Journal of Applied Mathematics

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-5، 5ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-07-07

دولة النشر

مصر

عدد الصفحات

5

التخصصات الرئيسية

الرياضيات

الملخص EN

A single machine predictive scheduling problem is considered.

The primary objective is to minimize the total completion times.

The predictability of the schedule is measured by the completion time deviations between the predictive schedule and realized schedule.

The surrogate measure of predictability is chosen to evaluate the completion time deviations.

Both of the primary objective and predictability are optimized.

In order to absorb the effects of disruptions, the predictive schedule is generated by inserting idle times.

Right-shift rescheduling method is used as the rescheduling strategy.

Three methods are designed to construct predictive schedules.

The computational experiments show that these algorithms provide high predictability with minor sacrifices in shop performance.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zhu, Hongli& Zhou, Hong. 2014. Single Machine Predictive Scheduling Using Inserted Idle Times. Journal of Applied Mathematics،Vol. 2014, no. 2014, pp.1-5.
https://search.emarefa.net/detail/BIM-461897

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zhu, Hongli& Zhou, Hong. Single Machine Predictive Scheduling Using Inserted Idle Times. Journal of Applied Mathematics No. 2014 (2014), pp.1-5.
https://search.emarefa.net/detail/BIM-461897

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zhu, Hongli& Zhou, Hong. Single Machine Predictive Scheduling Using Inserted Idle Times. Journal of Applied Mathematics. 2014. Vol. 2014, no. 2014, pp.1-5.
https://search.emarefa.net/detail/BIM-461897

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-461897