Single Machine Predictive Scheduling Using Inserted Idle Times
Joint Authors
Source
Journal of Applied Mathematics
Issue
Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-5, 5 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2014-07-07
Country of Publication
Egypt
No. of Pages
5
Main Subjects
Abstract EN
A single machine predictive scheduling problem is considered.
The primary objective is to minimize the total completion times.
The predictability of the schedule is measured by the completion time deviations between the predictive schedule and realized schedule.
The surrogate measure of predictability is chosen to evaluate the completion time deviations.
Both of the primary objective and predictability are optimized.
In order to absorb the effects of disruptions, the predictive schedule is generated by inserting idle times.
Right-shift rescheduling method is used as the rescheduling strategy.
Three methods are designed to construct predictive schedules.
The computational experiments show that these algorithms provide high predictability with minor sacrifices in shop performance.
American Psychological Association (APA)
Zhu, Hongli& Zhou, Hong. 2014. Single Machine Predictive Scheduling Using Inserted Idle Times. Journal of Applied Mathematics،Vol. 2014, no. 2014, pp.1-5.
https://search.emarefa.net/detail/BIM-461897
Modern Language Association (MLA)
Zhu, Hongli& Zhou, Hong. Single Machine Predictive Scheduling Using Inserted Idle Times. Journal of Applied Mathematics No. 2014 (2014), pp.1-5.
https://search.emarefa.net/detail/BIM-461897
American Medical Association (AMA)
Zhu, Hongli& Zhou, Hong. Single Machine Predictive Scheduling Using Inserted Idle Times. Journal of Applied Mathematics. 2014. Vol. 2014, no. 2014, pp.1-5.
https://search.emarefa.net/detail/BIM-461897
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-461897