Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production

المؤلفون المشاركون

Huang, Jinping
Ren, Tao
Yuan, Huawei
Jing, Yuanwei

المصدر

Journal of Applied Mathematics

العدد

المجلد 2013، العدد 2013 (31 ديسمبر/كانون الأول 2013)، ص ص. 1-5، 5ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2013-12-31

دولة النشر

مصر

عدد الصفحات

5

التخصصات الرئيسية

الرياضيات

الملخص EN

This paper considers the m-machine flow shop scheduling problem with the no-wait constraint to minimize total completion time which is the typical model in steel production.

First, the asymptotic optimality of the Shortest Processing Time (SPT) first rule is proven for this problem.

To further evaluate the performance of the algorithm, a new lower bound with performance guarantee is designed.

At the end of the paper, numerical simulations show the effectiveness of the proposed algorithm and lower bound.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Yuan, Huawei& Jing, Yuanwei& Huang, Jinping& Ren, Tao. 2013. Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production. Journal of Applied Mathematics،Vol. 2013, no. 2013, pp.1-5.
https://search.emarefa.net/detail/BIM-476484

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Yuan, Huawei…[et al.]. Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production. Journal of Applied Mathematics No. 2013 (2013), pp.1-5.
https://search.emarefa.net/detail/BIM-476484

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Yuan, Huawei& Jing, Yuanwei& Huang, Jinping& Ren, Tao. Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production. Journal of Applied Mathematics. 2013. Vol. 2013, no. 2013, pp.1-5.
https://search.emarefa.net/detail/BIM-476484

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-476484