Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production

Joint Authors

Huang, Jinping
Ren, Tao
Yuan, Huawei
Jing, Yuanwei

Source

Journal of Applied Mathematics

Issue

Vol. 2013, Issue 2013 (31 Dec. 2013), pp.1-5, 5 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2013-12-31

Country of Publication

Egypt

No. of Pages

5

Main Subjects

Mathematics

Abstract EN

This paper considers the m-machine flow shop scheduling problem with the no-wait constraint to minimize total completion time which is the typical model in steel production.

First, the asymptotic optimality of the Shortest Processing Time (SPT) first rule is proven for this problem.

To further evaluate the performance of the algorithm, a new lower bound with performance guarantee is designed.

At the end of the paper, numerical simulations show the effectiveness of the proposed algorithm and lower bound.

American Psychological Association (APA)

Yuan, Huawei& Jing, Yuanwei& Huang, Jinping& Ren, Tao. 2013. Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production. Journal of Applied Mathematics،Vol. 2013, no. 2013, pp.1-5.
https://search.emarefa.net/detail/BIM-476484

Modern Language Association (MLA)

Yuan, Huawei…[et al.]. Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production. Journal of Applied Mathematics No. 2013 (2013), pp.1-5.
https://search.emarefa.net/detail/BIM-476484

American Medical Association (AMA)

Yuan, Huawei& Jing, Yuanwei& Huang, Jinping& Ren, Tao. Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production. Journal of Applied Mathematics. 2013. Vol. 2013, no. 2013, pp.1-5.
https://search.emarefa.net/detail/BIM-476484

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-476484