Integrative Approach to the Plant Commissioning Process

المؤلفون المشاركون

Lawry, Kris
Pons, Dirk John

المصدر

Journal of Industrial Engineering

العدد

المجلد 2013، العدد 2013 (31 ديسمبر/كانون الأول 2013)، ص ص. 1-12، 12ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2013-01-20

دولة النشر

مصر

عدد الصفحات

12

التخصصات الرئيسية

العلوم الهندسية و تكنولوجيا المعلومات
علوم

الملخص EN

Commissioning is essential in plant-modification projects, yet tends to be ad hoc.

The issue is not so much ignorance as lack of systematic approaches.

This paper presents a structured model wherein commissioning is systematically integrated with risk management, project management, and production engineering.

Three strategies for commissioning emerge, identified as direct, advanced, and parallel.

Direct commissioning is the traditional approach of stopping the plant to insert the new unit.

Advanced commissioning is the commissioning of the new unit prior to installation.

Parallel commissioning is the commissioning of the new unit in its operating position, while the old unit is still operational.

Results are reported for two plant case studies, showing that advanced and parallel commissioning can significantly reduce risk.

The model presents a novel and more structured way of thinking about commissioning, allowing for a more critical examination of how to approach a particular project.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Lawry, Kris& Pons, Dirk John. 2013. Integrative Approach to the Plant Commissioning Process. Journal of Industrial Engineering،Vol. 2013, no. 2013, pp.1-12.
https://search.emarefa.net/detail/BIM-481729

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Lawry, Kris& Pons, Dirk John. Integrative Approach to the Plant Commissioning Process. Journal of Industrial Engineering No. 2013 (2013), pp.1-12.
https://search.emarefa.net/detail/BIM-481729

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Lawry, Kris& Pons, Dirk John. Integrative Approach to the Plant Commissioning Process. Journal of Industrial Engineering. 2013. Vol. 2013, no. 2013, pp.1-12.
https://search.emarefa.net/detail/BIM-481729

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-481729