Integrative Approach to the Plant Commissioning Process
Joint Authors
Source
Journal of Industrial Engineering
Issue
Vol. 2013, Issue 2013 (31 Dec. 2013), pp.1-12, 12 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2013-01-20
Country of Publication
Egypt
No. of Pages
12
Main Subjects
Engineering Sciences and Information Technology
Science
Abstract EN
Commissioning is essential in plant-modification projects, yet tends to be ad hoc.
The issue is not so much ignorance as lack of systematic approaches.
This paper presents a structured model wherein commissioning is systematically integrated with risk management, project management, and production engineering.
Three strategies for commissioning emerge, identified as direct, advanced, and parallel.
Direct commissioning is the traditional approach of stopping the plant to insert the new unit.
Advanced commissioning is the commissioning of the new unit prior to installation.
Parallel commissioning is the commissioning of the new unit in its operating position, while the old unit is still operational.
Results are reported for two plant case studies, showing that advanced and parallel commissioning can significantly reduce risk.
The model presents a novel and more structured way of thinking about commissioning, allowing for a more critical examination of how to approach a particular project.
American Psychological Association (APA)
Lawry, Kris& Pons, Dirk John. 2013. Integrative Approach to the Plant Commissioning Process. Journal of Industrial Engineering،Vol. 2013, no. 2013, pp.1-12.
https://search.emarefa.net/detail/BIM-481729
Modern Language Association (MLA)
Lawry, Kris& Pons, Dirk John. Integrative Approach to the Plant Commissioning Process. Journal of Industrial Engineering No. 2013 (2013), pp.1-12.
https://search.emarefa.net/detail/BIM-481729
American Medical Association (AMA)
Lawry, Kris& Pons, Dirk John. Integrative Approach to the Plant Commissioning Process. Journal of Industrial Engineering. 2013. Vol. 2013, no. 2013, pp.1-12.
https://search.emarefa.net/detail/BIM-481729
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-481729