Adaptive Step-Size Control in Simulation of Diffusive CVD Processes

المؤلفون المشاركون

Fleck, Christian
Geiser, Juergen

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2009، العدد 2009 (31 ديسمبر/كانون الأول 2009)، ص ص. 1-34، 34ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2009-05-10

دولة النشر

مصر

عدد الصفحات

34

التخصصات الرئيسية

هندسة مدنية

الملخص EN

We present control strategies of a diffusion process for chemical vapor deposition for metallic bipolar plates.

In the models, we discuss the application of different models to simulate the plasma-transport of chemical reactants in the gas-chamber.

The contribution are an optimal control problem based on a PID control to obtain a homogeneous layering.

We have taken into account one- and two-dimensional problems that are given with constraints and control functions.

A finite-element formulation with adaptive feedback control for time-step selection has been developed for the diffusion process.

The optimization is presented with efficient algorithms.

Numerical experiments are discussed with respect to the diffusion processes of the macroscopic model.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Geiser, Juergen& Fleck, Christian. 2009. Adaptive Step-Size Control in Simulation of Diffusive CVD Processes. Mathematical Problems in Engineering،Vol. 2009, no. 2009, pp.1-34.
https://search.emarefa.net/detail/BIM-493889

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Geiser, Juergen& Fleck, Christian. Adaptive Step-Size Control in Simulation of Diffusive CVD Processes. Mathematical Problems in Engineering No. 2009 (2009), pp.1-34.
https://search.emarefa.net/detail/BIM-493889

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Geiser, Juergen& Fleck, Christian. Adaptive Step-Size Control in Simulation of Diffusive CVD Processes. Mathematical Problems in Engineering. 2009. Vol. 2009, no. 2009, pp.1-34.
https://search.emarefa.net/detail/BIM-493889

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-493889