A branch and bound approach to solve the preemptive resource leveling problem

المؤلفون المشاركون

Afshar-Nadjafi, Behrouz
Khalaj, Zaynab
Mahdi Zadah, Ismail

المصدر

International Journal of Manufacturing Engineering

العدد

المجلد 2013، العدد 2013 (31 ديسمبر/كانون الأول 2013)، ص ص. 1-7، 7ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2013-10-27

دولة النشر

مصر

عدد الصفحات

7

التخصصات الرئيسية

العلوم الهندسية و تكنولوجيا المعلومات

الملخص EN

We study resource constrained project scheduling problem with respect to resource leveling as objective function and allowance of preemption in activities.

The branch and bound algorithms proposed in previous researches on resource leveling problem do not consider preemption.

So, representing a model for the problem, a branch and bound algorithm is proposed.

This algorithm can handle preemption in resource leveling problem.

Comparing the resource leveling problem and the preemptive resource leveling problem, it is observed that considering preemption in the problem leads to better results in the objective function.

This improvement imposes additional time to solve the problem.

Coding the algorithm in MATLAB and checking it on the projects with 8 and 10 activities, results show that the proposed algorithm is efficient.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Afshar-Nadjafi, Behrouz& Khalaj, Zaynab& Mahdi Zadah, Ismail. 2013. A branch and bound approach to solve the preemptive resource leveling problem. International Journal of Manufacturing Engineering،Vol. 2013, no. 2013, pp.1-7.
https://search.emarefa.net/detail/BIM-509115

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Afshar-Nadjafi, Behrouz…[et al.]. A branch and bound approach to solve the preemptive resource leveling problem. International Journal of Manufacturing Engineering No. 2013 (2013), pp.1-7.
https://search.emarefa.net/detail/BIM-509115

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Afshar-Nadjafi, Behrouz& Khalaj, Zaynab& Mahdi Zadah, Ismail. A branch and bound approach to solve the preemptive resource leveling problem. International Journal of Manufacturing Engineering. 2013. Vol. 2013, no. 2013, pp.1-7.
https://search.emarefa.net/detail/BIM-509115

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references : p. 6-7

رقم السجل

BIM-509115