A branch and bound approach to solve the preemptive resource leveling problem

Joint Authors

Afshar-Nadjafi, Behrouz
Khalaj, Zaynab
Mahdi Zadah, Ismail

Source

International Journal of Manufacturing Engineering

Issue

Vol. 2013, Issue 2013 (31 Dec. 2013), pp.1-7, 7 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2013-10-27

Country of Publication

Egypt

No. of Pages

7

Main Subjects

Engineering Sciences and Information Technology

Abstract EN

We study resource constrained project scheduling problem with respect to resource leveling as objective function and allowance of preemption in activities.

The branch and bound algorithms proposed in previous researches on resource leveling problem do not consider preemption.

So, representing a model for the problem, a branch and bound algorithm is proposed.

This algorithm can handle preemption in resource leveling problem.

Comparing the resource leveling problem and the preemptive resource leveling problem, it is observed that considering preemption in the problem leads to better results in the objective function.

This improvement imposes additional time to solve the problem.

Coding the algorithm in MATLAB and checking it on the projects with 8 and 10 activities, results show that the proposed algorithm is efficient.

American Psychological Association (APA)

Afshar-Nadjafi, Behrouz& Khalaj, Zaynab& Mahdi Zadah, Ismail. 2013. A branch and bound approach to solve the preemptive resource leveling problem. International Journal of Manufacturing Engineering،Vol. 2013, no. 2013, pp.1-7.
https://search.emarefa.net/detail/BIM-509115

Modern Language Association (MLA)

Afshar-Nadjafi, Behrouz…[et al.]. A branch and bound approach to solve the preemptive resource leveling problem. International Journal of Manufacturing Engineering No. 2013 (2013), pp.1-7.
https://search.emarefa.net/detail/BIM-509115

American Medical Association (AMA)

Afshar-Nadjafi, Behrouz& Khalaj, Zaynab& Mahdi Zadah, Ismail. A branch and bound approach to solve the preemptive resource leveling problem. International Journal of Manufacturing Engineering. 2013. Vol. 2013, no. 2013, pp.1-7.
https://search.emarefa.net/detail/BIM-509115

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 6-7

Record ID

BIM-509115