A study of factors causing cost overruns in Jordanian construction industry
مقدم أطروحة جامعية
مشرف أطروحة جامعية
Hiyasat, Muhammad A. S.
al-Jabburi, Karim M.
أعضاء اللجنة
الجامعة
جامعة الإسراء
الكلية
كلية الهندسة
دولة الجامعة
الأردن
الدرجة العلمية
ماجستير
تاريخ الدرجة العلمية
2014
الملخص الإنجليزي
The problem of cost overruns is still a critical issue in the construction industry worldwide as it is in Jordan.
This research paper attempts to analyze the main factors influencing the construction stage cost overruns in building projects in general covering both private and public sectors.
This research commenced by performing a general literature review to identify the factors influencing cost overruns followed by the preparation and distribution of a questionnaire to local Jordanian construction practitioners to distinguish those most significant factors.
A statistical analysis was carried out on the survey results to identify the significant top ten causative factors followed by conducting a factor analysis to extract the most critical.
The results obtained from the statistical analysis were later compared to the factors derived from the analysis of collected actual construction case studies.
The comparison established that additional work / change orders by client was ranked number one in both findings in addition to forming a minimum of 33.82 % of total additional costs in actually completed projects.
The research was concluded by providing recommendations for managing those critical factors through research and practical implementations.
التخصصات الرئيسية
الموضوعات
عدد الصفحات
150
قائمة المحتويات
Table of contents.
Abstract.
Chapter One : Introduction.
Chapter Two : Literature review.
Chapter Three : Research methodology.
Chapter Four : Identifying the general causative factors.
Chapter Five : Data collection.
Chapter Six : Results and discussion.
Chapter Seven : Factor anaylsis.
Chapter Eight : Case studies.
Chapter Ninth : Conclusions and recommendations.
References.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Matarnih, Sandra Tawfiq. (2014). A study of factors causing cost overruns in Jordanian construction industry. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-546132
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Matarnih, Sandra Tawfiq. A study of factors causing cost overruns in Jordanian construction industry. (Master's theses Theses and Dissertations Master). Isra University. (2014).
https://search.emarefa.net/detail/BIM-546132
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Matarnih, Sandra Tawfiq. (2014). A study of factors causing cost overruns in Jordanian construction industry. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-546132
لغة النص
الإنجليزية
نوع البيانات
رسائل جامعية
رقم السجل
BIM-546132
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)