A study of factors causing cost overruns in Jordanian construction industry
Dissertant
Thesis advisor
Hiyasat, Muhammad A. S.
al-Jabburi, Karim M.
Comitee Members
University
Isra University
Faculty
Faculty of Engineering
University Country
Jordan
Degree
Master
Degree Date
2014
English Abstract
The problem of cost overruns is still a critical issue in the construction industry worldwide as it is in Jordan.
This research paper attempts to analyze the main factors influencing the construction stage cost overruns in building projects in general covering both private and public sectors.
This research commenced by performing a general literature review to identify the factors influencing cost overruns followed by the preparation and distribution of a questionnaire to local Jordanian construction practitioners to distinguish those most significant factors.
A statistical analysis was carried out on the survey results to identify the significant top ten causative factors followed by conducting a factor analysis to extract the most critical.
The results obtained from the statistical analysis were later compared to the factors derived from the analysis of collected actual construction case studies.
The comparison established that additional work / change orders by client was ranked number one in both findings in addition to forming a minimum of 33.82 % of total additional costs in actually completed projects.
The research was concluded by providing recommendations for managing those critical factors through research and practical implementations.
Main Subjects
Topics
No. of Pages
150
Table of Contents
Table of contents.
Abstract.
Chapter One : Introduction.
Chapter Two : Literature review.
Chapter Three : Research methodology.
Chapter Four : Identifying the general causative factors.
Chapter Five : Data collection.
Chapter Six : Results and discussion.
Chapter Seven : Factor anaylsis.
Chapter Eight : Case studies.
Chapter Ninth : Conclusions and recommendations.
References.
American Psychological Association (APA)
Matarnih, Sandra Tawfiq. (2014). A study of factors causing cost overruns in Jordanian construction industry. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-546132
Modern Language Association (MLA)
Matarnih, Sandra Tawfiq. A study of factors causing cost overruns in Jordanian construction industry. (Master's theses Theses and Dissertations Master). Isra University. (2014).
https://search.emarefa.net/detail/BIM-546132
American Medical Association (AMA)
Matarnih, Sandra Tawfiq. (2014). A study of factors causing cost overruns in Jordanian construction industry. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-546132
Language
English
Data Type
Arab Theses
Record ID
BIM-546132