Construction project's site management using information and communication technology

مقدم أطروحة جامعية

al-Shammari, Salah al-Din Jamil

مشرف أطروحة جامعية

Ali, Ali Abbas

أعضاء اللجنة

al-Umar, Salih Ibrahim Ahmad
Yasin, Muhammad Fayiz

الجامعة

جامعة الإسراء

الكلية

كلية الهندسة

القسم الأكاديمي

قسم الهندسة المدنية

دولة الجامعة

الأردن

الدرجة العلمية

ماجستير

تاريخ الدرجة العلمية

2015

الملخص الإنجليزي

The construction projects are very complex and overlapping process.

Its control and administration are not an easy tasks.

The use of Information and Communication Techniques in Construction Projects Management started many decades ago and a lot of researches were conducted for achieving this ICT role.

In recent years, the Information and Communications Technology (ICT), has become an important and effective tool in the engineering projects management (due to the availability and ease of use) in the most advanced countries, while the Levant region countries in general and Jordan in particular still lag behind.

The first phase of this research was searching the real causes of this gap and determining the most influencing factors that hinder the use of ICT in the construction projects by conducting questionnaires to selected sample of site engineers and project managers and a number of interviews with some experts in the public and private sectors.

Accordingly, and as the second phase, a new web-based software package is proposed to contribute to alleviate the effect of the factors that hinder the use of ICT in the construction projects.

This software package was built from scratch and is designed using multiple languages and techniques that make it very convenient to be used by the site engineers to follow up their duties as well as project manager to manage the different tasks and documentations perfectly.

This package was adopted for application, by a construction company in the private sector, which carried out many small projects as a case study.

The results of this application test reveals an improvement in the management of these projects by achieving a considerable reduction in projects cost and completion time.

التخصصات الرئيسية

الهندسة المدنية
تكنولوجيا المعلومات وعلم الحاسوب

الموضوعات

عدد الصفحات

104

قائمة المحتويات

Table of contents.

Abstract.

Chapter One : Introduction.

Chapter Two : Literature survey.

Chapter Three : Data collection and analysis.

Chapter Four : Software implementation of construction project’s management based ICT.

Chapter Five : Results and discussion.

Chapter Six : Conclusions and recommendations.

References.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

al-Shammari, Salah al-Din Jamil. (2015). Construction project's site management using information and communication technology. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-651492

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

al-Shammari, Salah al-Din Jamil. Construction project's site management using information and communication technology. (Master's theses Theses and Dissertations Master). Isra University. (2015).
https://search.emarefa.net/detail/BIM-651492

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

al-Shammari, Salah al-Din Jamil. (2015). Construction project's site management using information and communication technology. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-651492

لغة النص

الإنجليزية

نوع البيانات

رسائل جامعية

رقم السجل

BIM-651492