Application of intelligent information systems for early warning in supply chain management : case study : construction project

مقدم أطروحة جامعية

al-Majmai, Muhammad Amir

مشرف أطروحة جامعية

al-Jabburi, Karim

أعضاء اللجنة

Muslim, Majid
Ali, Muhammad Mahdi

الجامعة

جامعة الإسراء

الكلية

كلية الهندسة

دولة الجامعة

الأردن

الدرجة العلمية

ماجستير

تاريخ الدرجة العلمية

2016

الملخص الإنجليزي

This study attempts to prove the impact of Information Technology (IT) in Supply Chain Management (SCM).

It includes the applications of Information Technology (IT); in order to attain a higher efficiency, optimizing marketing & financial performance, achieve higher customer satisfaction.

It’s summed up in a special program for Early Warning System "EWS" in the supply chain management to reduce the delay in the chain.

It is an engineering project management study that is about investigating Supply Chain Management (SCM) so a Fuzzy Expert System (FES) is used based on the combination of bow-tie diagrams and fuzzy set theory to design the program that supported the Supply Chain Management (SCM), and then determines the disturbances, which are factored as risks in the in the Supply Chain (SC).

The Fuzzy Expert System (FES) is applied to solve the interrelationships problems among all of its criteria.

The results found that advanced Information Technology (IT) is the sole cause that is leading to a high marketing performance and customer satisfaction.

The methodology include a phased process starting with the analysis of potential disturbances using cause-and-effect diagrams, followed by a bow-tie analysis relating disturbances, causes and consequences, used to derive fuzzy rules applied in the SC risk assessment, and ending with advice on control the consequences of disturbances.

Also to identify the main factors (causes) associated with the loss of Supply Chain Management (SCM).

The research indicated factors affecting on Supply Chain Management (SCM); however, the most of these are: lack of availability of skilled workers, weather conditions, bad supervision, bad labs, inadequate equipment, therefore it is recommended that the project manager should pay attention to those factors in order to avoid any delay.

Keywords: supply chain management, early warning system, expert system, fuzzy expert system, bow-tie diagram, information technology.

التخصصات الرئيسية

الهندسة المدنية

عدد الصفحات

93

قائمة المحتويات

Table of contents.

Abstract.

Chapter One : Introduction.

Chapter Two : Expert system and fuzzy expert system.

Chapter Three : Methodology.

Chapter Four : Results and analysis.

Chapter Five : Conclusions and recommendations.

References.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

al-Majmai, Muhammad Amir. (2016). Application of intelligent information systems for early warning in supply chain management : case study : construction project. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-707312

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

al-Majmai, Muhammad Amir. Application of intelligent information systems for early warning in supply chain management : case study : construction project. (Master's theses Theses and Dissertations Master). Isra University. (2016).
https://search.emarefa.net/detail/BIM-707312

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

al-Majmai, Muhammad Amir. (2016). Application of intelligent information systems for early warning in supply chain management : case study : construction project. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-707312

لغة النص

الإنجليزية

نوع البيانات

رسائل جامعية

رقم السجل

BIM-707312