Cost overruns in construction projects

المؤلفون المشاركون

Inshasi, Adnan
Abu Shaban, Salih

المصدر

المؤتمر الهندسي الدولي الثاني للإعمار و التنمية الجامعة الإسلامية-غزة، 3-4 سبتمبر 2007

الناشر

الجامعة الإسلامية كلية الهندسة

تاريخ النشر

2007-09-30

دولة النشر

فلسطين (قطاع غزة)

عدد الصفحات

12

التخصصات الرئيسية

الاقتصاد و التجارة

الملخص الإنجليزي

Cost is considered as one of the most important factors of success of construction projects.

The cost of any project may be within, under or overrun.

Accordingly, many of these projects have problems due to cost overrun which lead finally to increasing of project cost more than estimated budget.

However, in Palestine, this subject is considered as a sensitive matter due to difficult political conditions.

The aim of this paper is to identify and evaluate the main factors which contribute to cost overruns in construction projects in Gaza strip.

A questionnaire survey was conducted and 36 factors were identified, categorized into groups, evaluated and ranked from constructors and consultants perspectives.

The results indicates that contractors and consultants agreed that improper planning, , poor site management and sharp increase in materials cost are most important factors that contributes to cost overruns.

نوع البيانات

أوراق مؤتمرات

رقم السجل

BIM-775944

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Inshasi, Adnan& Abu Shaban, Salih. 2007-09-30. Cost overruns in construction projects. . , pp.14-25.Gaza Palestine : Islamic University of Gaza Faculty of Engineering.
https://search.emarefa.net/detail/BIM-775944

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Inshasi, Adnan& Abu Shaban, Salih. Cost overruns in construction projects. . Gaza Palestine : Islamic University of Gaza Faculty of Engineering. 2007-09-30.
https://search.emarefa.net/detail/BIM-775944

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Inshasi, Adnan& Abu Shaban, Salih. Cost overruns in construction projects. .
https://search.emarefa.net/detail/BIM-775944