Cost overruns in construction projects

Joint Authors

Inshasi, Adnan
Abu Shaban, Salih

Source

المؤتمر الهندسي الدولي الثاني للإعمار و التنمية الجامعة الإسلامية-غزة، 3-4 سبتمبر 2007

Publisher

Islamic University of Gaza Faculty of Engineering

Publication Date

2007-09-30

Country of Publication

Palestine (Gaza Strip)

No. of Pages

12

Main Subjects

Economy and Commerce

English Abstract

Cost is considered as one of the most important factors of success of construction projects.

The cost of any project may be within, under or overrun.

Accordingly, many of these projects have problems due to cost overrun which lead finally to increasing of project cost more than estimated budget.

However, in Palestine, this subject is considered as a sensitive matter due to difficult political conditions.

The aim of this paper is to identify and evaluate the main factors which contribute to cost overruns in construction projects in Gaza strip.

A questionnaire survey was conducted and 36 factors were identified, categorized into groups, evaluated and ranked from constructors and consultants perspectives.

The results indicates that contractors and consultants agreed that improper planning, , poor site management and sharp increase in materials cost are most important factors that contributes to cost overruns.

Data Type

Conference Papers

Record ID

BIM-775944

American Psychological Association (APA)

Inshasi, Adnan& Abu Shaban, Salih. 2007-09-30. Cost overruns in construction projects. . , pp.14-25.Gaza Palestine : Islamic University of Gaza Faculty of Engineering.
https://search.emarefa.net/detail/BIM-775944

Modern Language Association (MLA)

Inshasi, Adnan& Abu Shaban, Salih. Cost overruns in construction projects. . Gaza Palestine : Islamic University of Gaza Faculty of Engineering. 2007-09-30.
https://search.emarefa.net/detail/BIM-775944

American Medical Association (AMA)

Inshasi, Adnan& Abu Shaban, Salih. Cost overruns in construction projects. .
https://search.emarefa.net/detail/BIM-775944