Cost estimating practices of Gaza Strip construction contractors

المؤلفون المشاركون

Shaat, Kamalain M.
al-Shanti, Yasir Abd al-Rahman

المصدر

المؤتمر الهندسي الدولي الثاني للإعمار و التنمية الجامعة الإسلامية-غزة، 3-4 سبتمبر 2007

الناشر

الجامعة الإسلامية كلية الهندسة

تاريخ النشر

2007-09-30

دولة النشر

فلسطين (قطاع غزة)

عدد الصفحات

15

التخصصات الرئيسية

العلوم الهندسية والتكنولوجية (متداخلة التخصصات)

الملخص الإنجليزي

The aim of this research is to explore the local practices of Gaza strip contractors in cost estimating of construction projects.

A survey questionnaire supported by personal interviews was used for this purpose.

Fifty one questionnaires were distributed to contractors of first, second, and third classes.

Forty questionnaires were received and analyzed.

Most of contracting companies are relatively newly established ones dealing with small projects in terms of size and value.

However, as contracting business in Gaza strip is very competitive, contractors used to care much about details in the estimating process.

Contractors show special concern to estimating the material cost as it is the main component of a project cost.

Most uncertainties associated with construction projects come from the implications of Israeli security policies of closure and segmentation.

Gaza strip contractors show good potential to computerize the estimating process provided to have simple and flexible applications supported by suitable training and consultants.

نوع البيانات

أوراق مؤتمرات

رقم السجل

BIM-775947

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

al-Shanti, Yasir Abd al-Rahman& Shaat, Kamalain M.. 2007-09-30. Cost estimating practices of Gaza Strip construction contractors. . , pp.25-39.Gaza Palestine : Islamic University of Gaza Faculty of Engineering.
https://search.emarefa.net/detail/BIM-775947

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

al-Shanti, Yasir Abd al-Rahman& Shaat, Kamalain M.. Cost estimating practices of Gaza Strip construction contractors. . Gaza Palestine : Islamic University of Gaza Faculty of Engineering. 2007-09-30.
https://search.emarefa.net/detail/BIM-775947

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

al-Shanti, Yasir Abd al-Rahman& Shaat, Kamalain M.. Cost estimating practices of Gaza Strip construction contractors. .
https://search.emarefa.net/detail/BIM-775947