Multimode Preemptive Resource Investment Problem Subject to Due Dates for Activities: Formulation and Solution Procedure

Joint Authors

Arani, Mohammad
Afshar-Nadjafi, Behrouz

Source

Advances in Operations Research

Issue

Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-10, 10 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2014-09-29

Country of Publication

Egypt

No. of Pages

10

Main Subjects

Information Technology and Computer Science

Abstract EN

The preemptive Multimode resource investment problem is investigated.

The Objective is to minimize the total renewable/nonrenewable resource costs and earliness-tardiness costs by a given project deadline and due dates for activities.

In this problem setting preemption is allowed with no setup cost or time.

The project contains activities interrelated by finish-start type precedence relations with a time lag of zero, which require a set of renewable and nonrenewable resources.

The problem formed in this way is an NP-hard.

A mixed integer programming formulation is proposed for the problem and parameters tuned genetic algorithm (GA) is proposed to solve it.

To evaluate the performance of the proposed algorithm, 120 test problems are used.

Comparative statistical results reveal that the proposed GA is efficient and effective in terms of the objective function and computational times.

American Psychological Association (APA)

Afshar-Nadjafi, Behrouz& Arani, Mohammad. 2014. Multimode Preemptive Resource Investment Problem Subject to Due Dates for Activities: Formulation and Solution Procedure. Advances in Operations Research،Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1034340

Modern Language Association (MLA)

Afshar-Nadjafi, Behrouz& Arani, Mohammad. Multimode Preemptive Resource Investment Problem Subject to Due Dates for Activities: Formulation and Solution Procedure. Advances in Operations Research No. 2014 (2014), pp.1-10.
https://search.emarefa.net/detail/BIM-1034340

American Medical Association (AMA)

Afshar-Nadjafi, Behrouz& Arani, Mohammad. Multimode Preemptive Resource Investment Problem Subject to Due Dates for Activities: Formulation and Solution Procedure. Advances in Operations Research. 2014. Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1034340

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1034340